Suspended solids & SVI analysis.Discover S3A

Controlling H2S in Wastewater Treatment Works

Optimising odour control chemical dosing to tackle elevated H2S levels in a wastewater treatment works.

In this case study, a wastewater treatment works had issues with odour, and as such started dosing a nitrate based odour control chemical upstream of the inlet.

By installing a s::can spectro::lyser, the treatment works could monitor sulphide levels coming into the works and the baseline nitrate levels, this preventing odour issues, minimising the potenital of acid corrosion on concrete structures and optimising chemical dosing.

”s::can’s solution gives us a tool to efficiently dose odour control chemicals, reducing risks and lowering our costs.

Scott St. DenisTreatment Plant Operation Supervisor
View the results below.
Click Here Knowledgeable, experienced staff.

Need some advice or support? We’re here to help.

If you need a call back about how Process Measurement and Analysis can help you or have any questions at all please feel free to contact us at sales@pma.uk.com.  A member of our experienced team will contact you directly.